Steel Rolling Mill
Metallurgical Facility Buildings.
Tistas team was in charge of structural feasibility study and comparative analysis at Front-End Engineering stage of the project.
The use of BIM technologies and collaborative approach helped to avoid clashes, inconsistencies with mechanical equipment, piping and civil works. It also enabled the real-time measurement of the design change impacts, which is particularly beneficial at earlier project stages.
Scope
- Feasibility study
- Front-Eng Engineering Design of steel structures
- Fatigue Analysis
Fact sheet
- 30 to 40m span
- up to 40T crane overhead capacity
- 5000T of steel structures